FOA OSP Construction Guide

 

OSP Banner


Introduction

Review Of Fiber Optic Technology

Project Preparation And Guidelines

Underground Cable Construction

Underground Cable Installation

Aerial Cable Installation

Completing Outside Cable Plant Installation


 

 

 

Completing Outside Cable Plant Installation

 

At this point the fiber optic cable should be installed and is ready to be spliced, terminated, tested and connected to the communications systems. The FOA has complete technical information and courses on those next steps.

 

We suggest you go next to The FOA Online Guide to Outside Plant Fiber Optics which will cover the remaining installation topics. You can read the material online or use the FOA Reference Guide to Outside Plant Fiber Optics and The FOA Outside Plant Construction Guide textbooks.


If you would prefer a FREE online course, go to Fiber U for the OSP Course.

 

 

 

 

(C) 2018 The Fiber Optic Association Inc.

 

Return to the OSP Construction Guide Index